Winning big project from Baofeng
热门标签:GS8500-EX,Isolated Barrier,Baofeng Energy Winning big project from Baofeng 2020-06-15 Winning big project from Baofeng 7429

Ningxia Baofeng Energy Group Co., Ltd. (Baofeng Energy) and Shanghai Chenzhu Instrument Co., Ltd. (Chenzhu) have successfully commissioned a new methanol synthesis tower and the largest domestic air separation unit that is able to gasification 2.2 million tons/year of coke into 600,000-ton/year of polyolefin product on 29th May 2020.

In an effort to ensure the safety, reliability and performance of the operation on the DCS control system(Honeywell Experion® Process Knowledge System (PKS)), Chenzhu has installed more than 11, 000 pieces of GS8500-EX Isolated Safety Barrier for 30 000 I/O point.
https://bit.ly/2BuCd7H

Winning big project from Baofeng


Chenzhu GS8500-EX has been a strong choice due to:
Stable performance with high conversion accuracy with low-temperature drift
EMC standard complies to IEC61326-3-1
Certified TüV SIL3 application
G3 Coating that is applicable to the corrosive environment

Learn more about chenzhu and how we can help you. https://bit.ly/2XWQnX0


Winning big project from Baofeng


推荐文章栏目:
1
2
3
去对比
清空对比栏
询价单 021-64360668
phone
QQ
QQ
电话
询价单
0
顶部
顶部